This project involved excavating an area of land large enough for an L shaped stable block and hard-standing area. Once excavated the edge of the land was retained by building a chunky rockery wall. The area of land was landscaped flat and prepared for a concrete base for the stable block. Once the concrete was set and the buildings constructed the whole area was finished off with gravel and new fencing.
February 2018
Read more...March 2014
Read more...September 2013
Read more...July 2014
Read more...